10.2 MW Hydro Plant
10.2 MW Madar Batdara Hydro Power Project.
Project Site
Batdara Dist. Muzaffarabad AJK Pakistan
- 10.2 MW Madar Batdara Hydro Power Project
- Batdara has been approved for the development of 10.2 MW hydro power project by the Private Power Cell of Government of Azad Jammu and Kashmir
- The project is going to be developed on BOOT basis for 25 years.
Project Site: Batdara Near Muzaffarabad AJ&K Project Type: Hydro Power Project
Project Net Capacity: 10.2 MW
Configuration: 3 x Pelton Turbine
Pelton Turbine: PH22N2 -1060
Sponsor: Grange Holdings Limited
EPC: Matousek Czech Republic
Pelton Turbine: Mavel (Czech Rep.) (Vendor)