10.2 MW Hydro Plant

10.2 MW Madar Batdara Hydro Power Project.

Project Site
Batdara Dist. Muzaffarabad AJK Pakistan

 

- 10.2 MW Madar Batdara Hydro Power Project

- Batdara has been approved for the development of 10.2 MW hydro power project by the Private Power Cell of Government of Azad Jammu and Kashmir

- The project is going to be developed on BOOT basis for 25 years. 

 

Project Site: Batdara Near Muzaffarabad AJ&K Project Type: Hydro Power Project
Project Net Capacity: 10.2 MW
Configuration: 3 x Pelton Turbine

Pelton Turbine: PH22N2 -1060
Sponsor: Grange Holdings Limited

EPC: Matousek Czech Republic
Pelton Turbine: Mavel (Czech Rep.) (Vendor) 

1/7